![]() ![]() ![]() All documents that are required as part of the application and permit such as NOCs must be uploaded. As of April 1st, 2020, paper plans are no longer being accepted.Īll documents must be uploaded into the permit application through the MGO portal. If the permit requires plan review, original pdf files must be uploaded into the MGO system during the upload portion of the application process. The building permit will be submitted as an "Add to Existing" application under the approved zoning project.Īll permit applications with plan review must be submitted electronically using My Government Online (MGO) at, Guidelines for creating an account and submitting an application through MGO are available here. *PLEASE NOTE: Applications for Zoning and Site Approval must be submitted and approved prior to submitting a building permit for residential new dwellings, additions, pools, accessory structures, house moves, and manufactured homes. To view past, current, and proposed code adoption dates, please visit the Florida Building Code and Effective Dates, viewable on the Florida Department of Business and Professional Regulation's website. The current adopted version is ASCE 7-22. You can verify your wind speed by using the ASCE 7 Hazard Tool. Wind speed design shall be in accordance with Chapter 3 of the Florida Building Code, Residential, or Chapter 16 of the Florida Building Code, Building. The date for adoption of the 2023 Florida Building Code and 2020 National Electric Code was December 31, 2023. The current adopted codes are the 2023 Florida Building Codes, (8th Edition) which includes Residential, Building, Existing Building, Energy Conservation, Accessibility, Fuel and Gas, Plumbing, and Mechanical, and the 2020 National Electrical Code (NFPA 70). To ensure a meeting time, please schedule an appointment at the link above. If you need to meet with the Building Official, Deputy Building Official, or a Building Inspections Specialist, you may do so during public walk-in hours or by appointment after 12:30 p.m. Inspectors may be available to meet in the morning but due to the varying inspection schedule, it is best to schedule an appointment for the afternoon between 2:30 p.m. MAKE AN APPOINTMENT OR JOIN THE WAITLIST HERE. Meetings after our public hours may be scheduled by appointment. The permit counter is open to the public from 7:30 a.m. Tell us how we are doing by completing this short survey ! Building Inspections is a division of the Development Services Department.
0 Comments
Leave a Reply. |